Работайте офлайн с приложением Player FM !
Li-FT Power Concludes Winter Drill Program at Yellowknife
Manage episode 415550170 series 2410049
We connect with Francis Macdonald of Li-FT Power for a conversation regarding the recently completed winter drill program at the Yellowknife project. The program has successfully drilled 34,000 meters so far, contributing to an initial resource estimate. However, the limits of the pegmatites have not been defined yet. The conversation discusses the drill results from the Echo zone and the Big East pegmatite system. Li-FT will be taking all drill data into its maiden resource estimate for the project.
2943 эпизодов
Manage episode 415550170 series 2410049
We connect with Francis Macdonald of Li-FT Power for a conversation regarding the recently completed winter drill program at the Yellowknife project. The program has successfully drilled 34,000 meters so far, contributing to an initial resource estimate. However, the limits of the pegmatites have not been defined yet. The conversation discusses the drill results from the Echo zone and the Big East pegmatite system. Li-FT will be taking all drill data into its maiden resource estimate for the project.
2943 эпизодов
Все серии
×Добро пожаловать в Player FM!
Player FM сканирует Интернет в поисках высококачественных подкастов, чтобы вы могли наслаждаться ими прямо сейчас. Это лучшее приложение для подкастов, которое работает на Android, iPhone и веб-странице. Зарегистрируйтесь, чтобы синхронизировать подписки на разных устройствах.